CCNP

  1. About the Course
  2. Target Audience
  3. Why Choose Us?
  4. Syllabus
  5. Book the course

 

    Course Overview

      Cisco Certified Network Professional (CCNP) certification validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and work collaboratively with specialists on advanced security, voice, wireless and video solutions. The CCNP certification is appropriate for those with at least one year of networking experience who are ready to advance their skills and work independently on complex network solutions. Those who achieve the CCNP qualification have demonstrated the skills required in enterprise roles such as network engineer, support engineer, systems engineer or network technician.

      Course Length: 60 Hours

      Evening Classes

    • Monday and Wednesday
    • 6:30pm - 9:30pm
    • 10 weeks
    • Saturday Classes

    • 10:00am - 5:00pm
    • 10 weeks

 

    Why Choose Us?

    • Small class size which allows trainers to give required attention to each delegate
    • Flexible course schedules (Week Days, Weekend, Evenings) to suit your work and social life
    • Class room based, Tutor Led, hands-on training; giving you real life experience
    • Excellent Modern Facilities
    • Very affordable course fees without compromising on quality
    • All our courses are based on certification or project works
    • All our courses are Practical Based (Hands-on Training)
    • Taught by Certified Trainers
    • Employment Opportunities and Assisting in building your CV
    • Friendly and helpful staff

 

    Course Content

    EIGRP based solution, network design and a set of requirements

    • Network resources needed for implementing EIGRP on a network
    • Create an EIGRP implementation plan, EIGRP verification plan
    • Configure EIGRP routing
    • Verify EIGRP solution was implemented, Use show and debug commands
    • Document results of EIGRP implementation and verification

    • Multi-area OSPF Network, given a network design and a set of requirements

      • Determine network resources needed for implementing OSPF on a network
      • Create an OSPF implementation plan, OSPF verification plan
      • Configure OSPF routing
      • Verify OSPF solution was implemented properly using show and debug commands
      • Document results of OSPF implementation and verification plan

      • eBGP based solution, given a network design and a set of requirements

        • Determine network resources needed for implementing eBGP on a network
        • Create an IPv6 implementation plan, IPv6 verification plan
        • Configure IPv6 routing
        • Configure IPv6 interoperation with IPv4
        • Verify IPv6 solution was implemented properly using show and debug commands
        • Document results of IPv6 implementation and verification plan

        • IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements

          • Create a redistribution implementation plan based upon the results of the redistribution analysis
          • Create a redistribution verification plan
          • Configure a redistribution solution
          • Verify that redistribution was implemented
          • Document results of a redistribution implementation and verification plan
          • Identify the differences between implementing an IPv4 and IPv6 redistribution solution

          • Layer 3 Path Control Solution

            • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
            • Create a Layer 3 path control verification plan
            • Configure Layer 3 path control
            • Verify that a Layer 3 path control was implemented
            • Document results of a Layer 3 path control implementation and verification plan
            • Implement basic teleworker and branch services
            • Describe broadband technologies
            • Configure basic broadband connections
            • Public Key Infrastructure
            • Describe basic VPN technologies
            • Configure GRE
            • Describe branch access technologies

            • Implement VLAN based solution, given a network design and a set of requirements

              • Determine network resources needed for implementing a VLAN based solution on a network
              • Create a VLAN based implementation plan
              • Create a VLAN based verification plan
              • Configure switch-to-switch connectivity for the VLAN based solution
              • Configure loop prevention for the VLAN based solution
              • Configure Access Ports for the VLAN based solution
              • Verify the VLAN based solution was implemented properly using show and debug commands
              • Document results of VLAN implementation and verification

              • Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements

                • Determine network resources needed for implementing a Security solution
                • Create a implementation plan for the Security solution
                • Create a verification plan for the Security solution
                • Configure port security features
                • Configure general switch security features
                • Configure private VLANs Configure VACL and PACL
                • Verify the Security based solution was implemented properly using show and debug commands
                • Document results of Security implementation and verification

                • Implement Switch based Layer 3 services, given a network design and a set of requirements

                  • Determine network resources needed for implementing a Switch based Layer 3 solution
                  • Create an implementation plan for the Switch based Layer 3 solution
                  • Create a verification plan for the Switch based Layer 3 solution
                  • Configure routing interfaces Configure Layer 3 Security
                  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
                  • Document results of Switch based Layer 3 implementation and verification

                  • Prepare infrastructure to support advanced services

                    • Implement a Wireless Extension of a Layer 2 solution
                    • Implement a VoIP support solution
                    • Implement video support solution

                    • Implement High Availability, given a network design and a set of requirements

                      • Determine network resources needed for implementing High Availability on a network
                      • Create a High Availability implementation plan
                      • Create a High Availability verification plan
                      • Implement first hop redundancy protocols
                      • Implement switch supervisor redundancy
                      • Verify High Availability solution was implemented properly using show and debug commands
                      • Document results of High Availability implementation and verification

                      • Maintain and monitor network performance

                        • Develop a plan to monitor and manage a network
                        • Perform network monitoring using IOS tools
                        • Perform routine IOS device maintenance
                        • Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer

                        • Troubleshoot

                          • Multi Protocol system networks
                          • EIGRP
                          • OSPF
                          • eBGP
                          • Routing redistribution solution
                          • A DHCP client and server solution
                          • NAT
                          • First hop redundancy protocols
                          • IPv6 routing
                          • IPv6 and IPv4 interoperability
                          • Switch-to-switch connectivity for the VLAN based solution
                          • Loop prevention for the VLAN based solution
                          • Access Ports for the VLAN based solution
                          • Private VLANS
                          • Port security
                          • General switch security
                          • VACL and PACL
                          • Switch virtual interfaces (SVIs)
                          • Switch supervisor redundancy
                          • Switch support of advanced services (i.e., Wireless, VOIP and Video)
                          • A VoIP support solution
                          • A video support solution
                          • Layer 3 Security
                          • Issues related to ACLs used to secure access to Cisco routers
                          • Configuration issues related to accessing the AAA server for authentication purposes
                          • Security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)
Event Event Date Capacity Registered Available place Register
CCNP 01-06-2015 6:30 pm 5 0 5
CCNP 06-06-2015 10:00 am 5 0 5
CCNP 10-08-2015 6:30 pm 5 0 5
CCNP 15-08-2015 10:00 am 5 0 5
CCNP 19-10-2015 6:30 pm 5 0 5